Aerial Video New Wing Under Construction Aventura Mall Circa September 2022
- Home
- Stock Footage
- Overhead
- Aerial Video New Wing Under Construction Aventura Mall Circa September 2022
Aerial Video New Wing Under Construction Aventura Mall Circa September 2022
Aerial Video New Wing Under Construction Aventura Mall Circa September 2022
average based on ratings.
| File Size | 229.4MB |
| Preview Resolution | 960x540 |
| Frame Rate | 29.97 |
| Total Clip(s) Length | 00:29 |
| Looped Video | No |
| Number of Clips | 1 |
| Resolution | 3840x2160 |
| Video Encoding | H.264 |
| Tags | 4k, aerial, aventura mall, construction site, development, drone, expansion, florida, footage, industrial, miami, new wing, shopping center, usa, video |