Construction of a new bridge over the river. Tower cranes over the bridge across. Excavators and loa

Frame Rate: 29.97, Resolution: 3840x2160, Video Encoding: H.264, File Size: 170.43MB, Number of Clips: 1, Total Clip(s) Length: 00:15

Construction of a new bridge over the river. Tower cranes over the bridge across. Excavators and loaders working on bridges and roads. Warsaw. Poland

Most Popular Searches On Business Corporate