Aerial top layer pipework after the membrane, during the construction of gravel drainage system
- Home
- Stock Footage
- Construction
- The Top Layer Pipework After the Membrane During the Construction of Gravel Drainage System
The Top Layer Pipework After the Membrane During the Construction of Gravel Drainage System
The Top Layer Pipework After the Membrane During the Construction of Gravel Drainage System
average based on ratings.
| Alpha Channel | No |
| File Size | 2.51gb |
| Preview Resolution | 960x540 |
| Frame Rate | 30 |
| Total Clip(s) Length | 0:20 |
| Looped Video | No |
| Number of Clips | 1 |
| Resolution | 4096x2160 |
| Recognizable Buildings | No |
| Recognizable People | No |
| Source Audio | No |
| Video Encoding | ProRes |
| Tags | construction, construction land, construction site, culverts, development, dig, drain, drainage, drainage pipe, drainage system, equipment, excavation, foundation, industrial, industry, installation, installing, installing sewer system, laying, laying pipes, new foundation, pipe, pipeline, pipes, pit, plastic, plumbing, prepared development, pumping, sanitary sewer, sewage, sewer, sewer pipes, sewerage, system, trench, tube, underground, underground sewage, underground utilities, water, water system, work |